When copy/pasting a line item from history and/or revision and there is a tech assignment, it carries over that assignment. You cannot change that assignment using the global tech assignment within options. You have to manually edit each line, line by line.

Example:
Image

Is there a workaround or fix for this?
User avatar
Silky7
System Guru / Moderator
System Guru / Moderator
Posts: 1106
Joined: Mon Dec 31, 2007 10:07 am

Re: Global Tech Assignment Not Working

Post by Silky7 »

Dave,

The lines paste using the default Parts and Labor technicians specified in the Shop Data setup window. If these are set to Please, Select they should populate that way when pasted. The exception is <none>, which will then include the same assigned technician as the original lines.
M1 Product Manager
User avatar
murraymotive
100 Club: Active Contributor
100 Club: Active Contributor
Posts: 112
Joined: Mon Nov 30, 2009 5:19 am

Re: Global Tech Assignment Not Working

Post by murraymotive »

Silky7 wrote:Dave,

The lines paste using the default Parts and Labor technicians specified in the Shop Data setup window. If these are set to Please, Select they should populate that way when pasted. The exception is <none>, which will then include the same assigned technician as the original lines.

Ours are set to none. The issue still remains. We cannot override the assignment.
User avatar
Silky7
System Guru / Moderator
System Guru / Moderator
Posts: 1106
Joined: Mon Dec 31, 2007 10:07 am

Re: Global Tech Assignment Not Working

Post by Silky7 »

Correct. If set to <none>, the technician from the original line item will copy over. Line item assignment overrides the order assignment. Is it feasible for you to switch from <none> to the Please, Select entry?
M1 Product Manager
User avatar
ricmorin
5K Holy Smokes Contributor
5K Holy Smokes Contributor
Posts: 5997
Joined: Mon Jul 25, 2005 10:11 am
Location: New Hampshire
Contact:

Re: Global Tech Assignment Not Working

Post by ricmorin »

Some of us LIKE and prefer <none> because if you forget to fill a technician and times, the program reminds us that there is a labor set to <none>. By using please select, we completely override that useful feature.

I see no reason why I would want to retain a tech assignment when copying from History.
Ric Morin - Volunteer Forum Moderator, Shop Owner, ASE Master L1
Motorcar Alternatives, LLC
603-622-6434 x203
www.motorcaralternatives.com

I find my life is a lot easier when I use Special Orders
User avatar
murraymotive
100 Club: Active Contributor
100 Club: Active Contributor
Posts: 112
Joined: Mon Nov 30, 2009 5:19 am

Re: Global Tech Assignment Not Working

Post by murraymotive »

ricmorin wrote:Some of us LIKE and prefer <none> because if you forget to fill a technician and times, the program reminds us that there is a labor set to <none>. By using please select, we completely override that useful feature.

I see no reason why I would want to retain a tech assignment when copying from History.
Bingo.
User avatar
Silky7
System Guru / Moderator
System Guru / Moderator
Posts: 1106
Joined: Mon Dec 31, 2007 10:07 am

Re: Global Tech Assignment Not Working

Post by Silky7 »

I understand the desire for validation. I think there was some confusion on my end because typically when something like this gets reported, it's because the behavior suddenly changed in a release. As far as I can tell from testing various versions it's always observed the same logic I stated above.

Long story short, it changes how this issue is classified and prioritized. :wink: